Rig Inspections and Condition and Acceptance

Rig Inspections and Condition and Acceptance


Rig condition & acceptance surveys are defined as comprehensive assessments by way of a detailed evaluation of equipment and systems. This inspection will cover an in-depth survey of the state of maintenance of the rig. It includes an inspection of all safety critical elements of the installation and all equipment that could be anticipated to cause operational downtime when a mechanical failure of that equipment occurs.

The inspection includes, but is not limited to, the opening of critical equipment for verification that the equipment has been kept in a safe and reliable working condition and includes all major items of equipment to ensure a detailed examination of gear teeth, bearings, chains and ancillary parts for excessive wear, damage, cracks and other defects and for the measurements of clearances. In addition function testing, pressure testing, load testing and insulation resistance checks for all critical equipment on board the drilling unit, as applicable, will be conducted accompanied by a check that the proper safety devices are installed and are working correctly to prevent accidents and equipment failures. Our safety inspections can be tailored to your requirements and can incorporate IMO Modu Code, requirements, UK & reciprocal International Department of Energy standards, General Safety Equipment inspections, Safety and Emergency Procedures, Safety Cases, System and Equipment
Business Setup

The scope of the inspection will include:

  • DRILLING EQUIPMENT
  • Draw Works and Rotary Table
  • Top Drive System
  • Swivel and Kelly Equipment
  • Crown Block and Travelling Block
  • Hook and Drill String Compensator
  • Drilling Instrumentation
  • Derrick/Casing Stabbing Board
  • Tuggers and Sheaves
  • Man-Riding Winches
  • Survey Line and Ezy-Torq
  • Pipe Spinning Wrench
  • Pipe Handling Equipment
  • Pipe Racker
  • Iron Roughneck
  • Well Testing Equipment
  • Mud Pumps and Mud Agitators
  • Centrifugal Pumps
  • Shale Shaker and Mud Cleaner
  • Desilter, Desander and Degasser
  • Mud Mixing System
  • Standpipe Manifold

WELL CONTROL EQUIPMENT
  • Wellhead Connector
  • Marine Riser Joint (Pins/Boxes)
  • Ram Type BOP
  • Marine Riser Handling Tools
  • Annular BOP
  • Diverter Assembly
  • Flex Joint
  • Diverter Control Console
  • Marine Riser Adapter
  • Riser Tensioner
  • Choke and Kill Stabs
  • Guideline Tensioning System
  • Gate Valve, Failsafe
  • Underwater TV System
  • Surface Hydraulic BOP Control Unit
  • Choke and Kill Manifold
  • BOP Control System
  • Choke Remote Control Panel
  • Marine Riser System
  • BOP Handling Equipment

ELECTRICAL EQUIPMENT

  • Elmagco Brake
  • AC Motors
  • Transformers
  • Generators
  • DC Motors
  • Electrical Safety Regulations
BARGE EQUIPMENT
  • Ballast and Bilge System
  • Bulk Air System and Tanks
  • Overflow and Vent Checks
  • Registration and Classification
  • Watertight Integrity
  • Communication Equipment
  • Mooring System
  • General Operations
ENGINE-ROOM EQUIPMENT
  • Diesel Engines
  • Crane and Power System
  • Emergency Generator Set
  • Marine Reduction Gearbox and Propulsion
  • Watermaker
  • Thruster Unit
  • Air Compressor
  • Preventive Maintenance System


SAFETY INSPECTION

  • Fire Control System
  • General Safety Items
  • Automatic Fire Detection System
  • Gas Detection System
  • CO2 System For Fire Control
  • Helicopter Facilities
  • Fire Station
  • Drilling Facilities Safety
  • Extinguishers & Fire-Fighting Equipment
  • First-Aid and Sick-Bay
  • Foam System For Heli-Deck
  • Emergency Procedures
  • Survival and Life-Saving
  • Lifting and Handling
  • Lifeboat
  • Living Quarters
  • Davit-Launched Life-Raft Station
  • Pollution Control
  • Escape Routes
  • Housekeeping
  • Breathing Apparatus
  • Work Permits
Our Engineering staff all require a minimum of 10 years experience in the offshore oil and gas industry, they must also be familiar and competent with the skill sets required